The topic of handover is subject to shared awareness between developer and landowner. Generally, the possession/ handover is required after the authority involved has accepted the proposal.
Approval of the proposal depends on building height, apartment number, authority clearance (RAJUK, Cantonment Board, etc.), and land status.
Common spaces include lift lobby, staircase, generator room, prayer room, visitor area, and reception.
Yes, Edison tests steel bars and concrete strength.
We follow construction standards and use high-grade materials, along with earthquake resistance.